Mentored an intern through a merchant voucher database migration to PSM, then took over ownership of the cutover, database rollback, and QA testing.

2025-psm-migration-merchant-voucher · main
# E-Commerce / Infrastructure
$ go -X POST /2025-psm-migration-merchant-voucher/v1/sync
→ 201 Created
{ "status": "ok" }
publish 2025-psm-migration-merchant-voucher.synced
Role
Backend Engineer / Mentor
Timeline
2025
Team
3
Domain
E-Commerce / Infrastructure
Stack
7 tech
Status
Live
01

Overview

This project migrated the merchant voucher database onto PSM. I began as a mentor to an intern based in Yogyakarta — explaining the database structure and service flow, reviewing code, and guiding the cutover plan — and later took over the remaining work, including ownership of the final cutover.

A backend has no screens, so its "UI" is the operational surface: the migration/ops flow, the QA test matrix, and the cutover report.

Ops view — migration & cutover flow
Test matrix — manual, regression & live testing
Cutover report — rollback & hotfix notes
03

Problem & Solution

Problem

Because I started as a mentor rather than a hands-on owner, I had limited context on some flows and documentation. When the intern's tenure ended before completion, I had to absorb the remaining tasks quickly and ensure the database cutover still ran safely.

Solution

I maintained close communication with the intern, gave detailed explanations, ran regular code reviews, and guided a structured cutover plan. After the handover I completed the outstanding requirements, managed the database rollback process, and collaborated with the QA engineer on manual, regression, and live testing. I then led the cutover alongside QA and a teammate, dividing responsibilities for a smooth execution.

04

Workflow

Three actors interact with the service; the diagrams are written in English to stay consistent across both languages.

flowchart diagram

guide

code + plan

takeover

migrate

Mentor

Intern

Merchant Voucher DB

Cutover + Rollback

PSM Runtime

Use case interaction
sequence diagram
Merchant Voucher DBQAInternMentorMerchant Voucher DBQAInternMentorexplain DB structure & flowprepare migration stepstake over remaining tasksmanual / regression / live testexecute cutoverdeployment issuehotfix + rollback
Cutover sequence
05

Architecture

flowchart diagram

metrics

Callers

Merchant Voucher Service · PSM

Managed RDS

Serving Platform

Prometheus / Grafana

System architecture
Architecture notes

The merchant-voucher-service moved onto PSM with resources via the internal serving platform and the internal cloud platform and its data on a managed RDS (relational database), with Prometheus/Grafana for monitoring. The cutover plan included an explicit rollback path, which proved essential when a deployment issue surfaced during release and required an immediate hotfix.

state diagram

intern tenure ends

QA sign-off

release

deployment issue

mentoring

handover

tested

cutover

rolled_back

Cutover lifecycle
06

Features

Mentorship
  • Intern onboarding on DB & service flow
  • Regular code reviews
  • Cutover planning guidance
Ownership
  • Took over remaining tasks
  • Final cutover ownership
  • Database rollback management
Quality
  • Manual, regression & live testing with QA
  • Coordinated cutover execution
07

Tech Stack

language
Go
infra
Serving PlatformPSMinternal cloud platform
database
Managed RDS
observability
PrometheusGrafana
08

Engineering Challenges

01
Building context after a late handover

I joined as a mentor rather than a hands-on owner, so after taking over I hit gaps in flows and documentation. Fix: I dug into the sources myself to rebuild context — a reminder to stay engaged from the start when responsibilities can shift.

02
Incomplete steps at handover

Some critical steps had not been completed or communicated when the intern's tenure ended, delaying the cutover. Fix: I took ownership, completed the outstanding requirements, and managed the database rollback process.

03
An undetected deployment issue at cutover

During cutover we hit a deployment issue that testing had missed. Fix: an immediate hotfix, and a lesson to allocate more time for thorough testing and build more comprehensive test cases for edge scenarios.

09

Outcomes

1
intern mentored to handover
3
testing types with QA
3
engineers coordinating cutover
10

Lessons Learned

Staying engaged from the beginning builds the context needed when responsibilities shift. The incomplete handover taught me to verify that every step is truly done and communicated, and the undetected deployment issue reinforced the value of allocating enough time for thorough testing and more comprehensive edge-case coverage.